Explore ADU Rules in St. Louis Park: Design & ROI

October 16, 2025

Thinking about adding a backyard cottage or private suite to your St. Louis Park home? You’re not alone. ADUs can unlock flexibility for multigenerational living, rental income, and future resale appeal. In this guide, you’ll learn the local rules, smart design choices, realistic costs and ROI, plus a simple plan to move forward with confidence. Let’s dive in.

What counts as an ADU in St. Louis Park

An accessory dwelling unit is a self-contained home with its own kitchen, bathroom, and lockable entrance. It can be inside or attached to your primary home, or in a detached structure in your yard. St. Louis Park requires ADUs to meet the Minnesota State Building Code, just like any other permanent dwelling. You can review definitions and standards on the city’s ADU guidance page in the planning and zoning section on the city website.

Key rules at a glance

Size and height

  • Attached or interior ADU size is capped at 40 percent of the principal home’s gross floor area.
  • Detached ADUs must be at least 200 square feet. The maximum building height is generally 15 feet.
  • Detached ADUs require a permanent foundation with frost-protected footings suited to Minnesota’s climate. Details appear in the city’s ADU guidance.

Setbacks and site layout

  • Typical minimum setbacks for a detached ADU: 5 feet from side interior lot lines and 15 feet from the rear lot line.
  • If your lot abuts an alley, the rear setback can be 5 feet.
  • New ADUs do not require additional off-street parking, but garage conversions that remove required parking for the main home are restricted unless required parking can be relocated behind the front face of the house. See the city’s ADU page for specifics.

Owner occupancy and renting

  • City materials emphasize owner-occupied situations when discussing ADUs. Confirm exact ordinance language with the city for your property.
  • If any unit on the lot will be non-owner-occupied and rented, you must obtain a city rental license and complete required training. Learn more on St. Louis Park’s rental license page.

Permits and building code

Every ADU requires a building permit. Depending on the project, you may also need plumbing, mechanical, and electrical permits, and possibly demolition or erosion control permits. Detached ADUs receive a certificate of occupancy after inspections. All ADUs must comply with the Minnesota State Building Code, including egress, fire separation for attached units, HVAC and electrical sizing, and water and sewer capacity. Start with the city’s ADU process overview and confirm details with planning and building staff.

Design choices that work here

Interior or attached ADU

Converting a basement or part of the main floor is often the most cost-effective option. Expect to plan for a separate entrance, proper egress, and fire-rated assemblies between units. This approach is ideal for multigenerational living or moderate rental income.

Above-garage or garage conversion

Above-garage suites are popular in the Twin Cities. Two-story conversions often require frost-protected foundations and structural upgrades. Be mindful of parking rules if the conversion removes required parking for the main home.

Detached backyard cottage

A new backyard cottage offers the most privacy and flexibility, with its own foundation and utilities. It usually carries higher upfront cost due to site work, full utility connections, and a separate building envelope.

Climate-ready construction

Minnesota’s climate drives some key choices: frost footings, robust insulation, properly sized HVAC, and planned ventilation. Think through utility capacity and control, including whether to share or separate meters. The city highlights these code topics in its ADU guidance.

Fit and privacy

Designing to complement neighborhood character can smooth approvals and neighbor relations. Consider rooflines, materials, landscaping, and screening. The Family Housing Fund’s Twin Cities idea book offers helpful visuals and tips for right-sized, context-sensitive design. Explore their mid-century ADU idea book.

Cost ranges and ROI snapshots

Construction costs vary with type, size, finishes, and site work. Recent regional and national summaries put common Twin Cities ranges roughly in the $100,000 to $350,000+ band, with interior or garage conversions on the lower end and detached cottages on the higher end. For broad context, see cost summaries from Angi and a regional overview from Neighbor.

Rents in St. Louis Park for smaller units often land in the low to mid 1,000s per month, with larger two-bedroom rents commonly higher. Operating expenses for a single rental unit often pencil in the 35 to 45 percent range of gross rent for budgeting, depending on who pays utilities and whether you self-manage.

Here is a simple illustration:

  • Example: total project cost of $200,000 for a detached ADU; rent at $1,800 per month.
  • Gross annual rent is $21,600. At a 40 percent expense load, estimated net operating income is about $12,960.
  • That equates to roughly a 6.5 percent return on build cost and a simple payback around 15 years. Results improve with higher rent or lower cost and lengthen with higher cost or lower rent. Always run a detailed pro forma with local bids, taxes, insurance, and vacancy.

Step-by-step plan to get started

  • Step 1: Do an early city check. Confirm your zoning district, lot specifics, and allowable ADU types with planning staff. Start with the city’s ADU page.
  • Step 2: Assess feasibility. Gather a survey, map setbacks and alleys, note current parking, and sketch concepts for interior, garage, or detached options.
  • Step 3: Get preliminary bids and a utility review. Talk with an architect or design-build firm about scope, site work, and utility sizing and connections.
  • Step 4: Submit permits and plan for inspections. If you plan to rent a unit that is not owner-occupied, apply for the city’s rental license.

Typical timeline

Many Twin Cities providers quote 9 to 18 months from early design through construction for a detached ADU, with interior or garage conversions often faster. Timing depends on permit review, site complexity, contractor availability, and winter conditions. For planning context, see a regional ADU FAQ from Second Suite.

How an ADU can affect resale

ADUs often increase property utility and marketability, especially where rental demand is strong. Reported price impacts vary by market, unit size, and quality, and appraisers may use different methods to capture value. For broader context on ADU outcomes, review the Terner Center’s ADU owner survey and research. The right ADU can be a smart long-term move, but confirm neighborhood comps before you build.

Ready to evaluate the numbers on your lot, plus the resale implications on your block? Let’s talk through your goals and options so you can decide with clarity. Connect with the team you can trust at Morgan Real Estate Group.

FAQs

What are the size and height limits for ADUs in St. Louis Park?

  • Attached ADUs can be up to 40 percent of the main home’s gross floor area; detached ADUs must be at least 200 square feet and are generally capped at 15 feet in height. See the city’s ADU standards.

Do I need extra parking when I add an ADU in St. Louis Park?

  • The city does not require additional off-street parking for a newly created ADU, but garage conversions that remove required parking for the main home are restricted unless you relocate required parking behind the home’s front face. Details are on the city’s ADU page.

What permits and inspections are required for an ADU in St. Louis Park?

  • You will need a building permit and likely plumbing, mechanical, and electrical permits. Detached ADUs receive a certificate of occupancy after inspections. Renting a non-owner-occupied unit requires a city rental license.

How much does it cost to build an ADU in the Twin Cities?

  • Recent summaries show wide ranges: roughly $100,000 to $350,000+ depending on type, size, finishes, and site work. Review broad ranges from Angi and Neighbor, then get local bids for accuracy.

How long does it take to design and build a detached ADU in St. Louis Park?

  • Many projects run 9 to 18 months from early design through construction, depending on permit timing, site complexity, contractor schedules, and winter conditions. See a regional timeline overview from Second Suite.

Can I use my ADU for short-term rentals in St. Louis Park?

  • The city requires a rental license for non-owner-occupied long-term rentals and many cities restrict short-term rentals. Check St. Louis Park’s business and rental license requirements before planning an STR.

How do ADUs affect home value in the Twin Cities?

  • ADUs can add appeal and potential value, but results vary by neighborhood, unit size, and quality. For broader findings, see the Terner Center’s ADU research, and consult local comps before you build.

Work With Us

It is our plan to continue this tradition and we look forward to serving you.