November 12, 2026
Many of the people who shop at Shanghai Market don't live nearby. The owner told the Sun Sailor that her customers come from Edina, Minnetonka, Wayzata, Bloomington, Minneapolis and Golden Valley for imported staples they can't get at big-box grocery stores. Since they don't know the neighborhood, she said, many of them reach a "ROAD CLOSED" sign at Cedar Lake Road and Louisiana Avenue, turn around, and go home.
The road behind that sign is scheduled to reopen Friday. St. Louis Park's Nov. 5 project update set Friday, Nov. 20, as the tentative date for reopening Cedar Lake Road between Rhode Island and Kentucky avenues and Louisiana Avenue between Fire Station 2 and the railroad bridge. For most drivers the reopening ends a detour. For the businesses at Westwood Shopping Center, it ends a season in which tenants said the construction and the closure signs both kept customers away. Their street is also coming back narrower and slower, with a marked crossing on every leg of the new intersection.
In July, KSTP reported that Westwood Shopping Center tenants were feeling the effects of the work at Cedar Lake Road and Louisiana Avenue. Dan Ullsperger of Ullsperger Brewing said the brewery's gross sales in June 2026 were down more than 50%. He said conversations with 12 other Westwood tenants pointed to the same causes: construction and confusing signs. His message to customers was that "business access" on a sign means the business is open to traffic.
Shanghai Market's owner described the same issue to the Sun Sailor. "The sign is too small and the big sign saying 'closed' is too big," she said. She suggested reversing the proportions so drivers would see that the businesses were still operating. The city's project page says the streets are closed to through traffic, with access to businesses maintained from Louisiana Avenue to the north and Cedar Lake Road to the east and west. According to the tenants, the closure signs at the corner made those access routes hard to see.
The city's reopening date lines up with MnDOT's schedule for the I-394 interchange just north of the shopping center. If both hold, Westwood will be reachable from every direction again by the end of the weekend.
| Closure | Where | Scheduled through |
|---|---|---|
| City reconstruction, closed to through traffic | Cedar Lake Road, Rhode Island Ave. to Kentucky Ave.; Louisiana Ave., Fire Station 2 to the railroad bridge | Tentative reopening Friday, Nov. 20 |
| MnDOT frontage road closure | Wayzata Blvd., east of Hampshire Ave. to Colorado Ave. | Saturday, Nov. 21 |
| MnDOT lane reduction | Louisiana Ave. on the I-394 bridge, one lane each direction | Saturday, Nov. 21 |
| MnDOT lane closure | Eastbound I-394 E-ZPass lane, west of Louisiana Ave. to east of Xenia Ave./Park Place Blvd. | Wednesday, Nov. 25 |
| MnDOT intermittent closures | I-394 both directions, Louisiana Ave. to Xenia Ave./Park Place Blvd. | Late November |
The Nov. 20 date is tentative. Rain pushed final paving at the intersection to a planned Nov. 9 to 11 window. Final striping and pavement markings were scheduled for the week of Nov. 16. Weather also delayed sod. The city and its contractor have a contingency plan to stabilize and protect the ground over the winter and lay the sod in spring if they can't finish this year.
MnDOT's interchange work is also changing how cars reach Louisiana Avenue from the highway. The project removes the free right turns from northbound Louisiana onto eastbound I-394 and from southbound Louisiana onto westbound I-394. It also replaces the signals on both sides of the ramps and adds accessible curb ramps at the interchange.
The weekend of Nov. 20 is scheduled to finish a project the city has built in stages. Phase I rebuilt Cedar Lake Road from Highway 169 to Rhode Island Avenue. The 2025 season covered Louisiana Avenue from Fire Station 2 to Wayzata Boulevard, along with an underground stormwater treatment structure in Willow Park. The 2026 season covered the stretch in front of Westwood.
On the 2026 section, the city narrowed the roadway to calm traffic. The traffic signal at Cedar Lake Road and Louisiana Avenue is replaced by a roundabout, with rectangular rapid flashing beacons at every crosswalk. A few blocks over, the signal at Nevada Avenue and Cedar Lake Road is also gone, replaced by flashing beacons that help people walking and biking cross. Cedar Lake Road gets a cycle track and a new sidewalk on its south side, and Louisiana Avenue gets a new sidewalk on its east side. The city's scope describes the cycle track as one-way on each side of Cedar Lake Road.
Louisiana Avenue doesn't have its own bike lane. Its bike route runs on parallel neighborhood streets to the west and east. The city says it chose that design to work for riders of all ages and abilities and to limit tree removal along the corridor.
The roundabout will change the pace of the corner the most. According to MnDOT's roundabout guidance, the radius and entry angles of a roundabout slow every vehicle to about 15 to 25 mph. That's the speed drivers will be going as they pass the Westwood storefronts.
The whole project cost $28,614,956.15, according to the city council's May 4, 2026 agenda packet. Just under half of that came from outside the city: $7 million in federal aid, $2 million in congressional directed spending and $5 million from the state's Local Road Improvement Program. Municipal state aid, bonds and city utility revenue covered the rest.
This is a new kind of intersection on a familiar route, so the first few trips will take some attention. MnDOT's guidance covers all three ways of getting through:
Westwood Shopping Center sits at the corner the construction closed off, with storefronts on both Louisiana Avenue and Cedar Lake Road. In August, the center marked its 72nd anniversary. Westopolis listed sidewalk specials and an Ullsperger after-party for the Aug. 8 event. Here are the posted hours for several of its food and drink spots:
| Business | Address | Posted hours |
|---|---|---|
| Ullsperger Brewing | 2314 Louisiana Ave. S. | Mon. closed; Tue. 5 to 10 p.m.; Wed. to Fri. 3 to 10 p.m.; Sat. noon to 10 p.m.; Sun. 11:30 a.m. to 8 p.m. |
| Ariana Kabob & Gyro Bistro | 7115 Cedar Lake Rd. | Mon. to Sat. 11 a.m. to 8:30 p.m.; Sun. 11 a.m. to 7 p.m. |
| Pizza Mamba | 7117 Cedar Lake Road S. | Sun. to Thu. 11 a.m. to 8 p.m.; Fri. and Sat. 11 a.m. to 9 p.m. |
| Sichuan Restaurant | 7239 Cedar Lake Rd. | Mon. to Sat. 11 a.m. to 9 p.m.; Sun. noon to 8 p.m. |
Ullsperger takes $1 off all beers until 5 p.m. A cranberry beer was on its coming-soon list for Nov. 14. Ariana serves Greek and Turkish street food and is halal. It takes online orders and catering requests through its site, which helps if you're feeding a crowd over the holiday. Westopolis describes Pizza Mamba as a New York-style shop selling pizza by the slice or the whole pie, with wings, garlic cheesy bread, cookies and brownies. The same directory describes Sichuan Restaurant as a counter-service spot serving Chinese and Vietnamese food for dine-in or carryout.
The Sun Sailor described Shanghai Market as a family-owned store whose aisles are stocked with dried mushrooms, stocks and soup bases, spices, curry pastes, sauces, vegetables and meats that big-box grocers don't carry. Other businesses listed for the August anniversary include A Barber's Touch, Amazing Massage, DK Diamond Nails, HIT Results Fitness, U.S. Cleaners and Warrior's Cove.
If the city's date holds, Westwood's first full week back on a through street will be Thanksgiving week. MnDOT's eastbound E-ZPass lane closure on I-394 runs through Wednesday, Nov. 25, so the highway may still be slow for anyone heading east to grocery shop before the holiday.
The same Wednesday, the city is hosting Turkeys on Ice, a free indoor skate with free skate rentals, from noon to 1:30 p.m. at the Rec Center West Ice Arena, 3700 Monterey Drive. Willow Park, at 2500 Rhode Island Ave. S. near the western end of the rebuilt stretch, has a playground, basketball courts and picnic tables. The stormwater treatment structure the city built there in 2025 is underground. From the park, you can try the new sidewalk and the beacon crossings on foot before driving the roundabout for the first time.
When construction reshapes a corner, it affects how buyers see the homes nearby, and we follow those changes block by block. If you own a home near Cedar Lake Road and Louisiana Avenue and wonder how the rebuilt corridor fits into its value, Michelle & Patrick Homes can walk you through it. Request Your Home Valuation, and we'll include what the finished project means for your street.
Stay up to date on the latest real estate trends.
It is our plan to continue this tradition and we look forward to serving you.